Fundación Naturgy / FPE. Vol.2 Digitalización de redes eléctricas

Vol. 2 . Digitalización de redes eléctricas. Formación para un futuro descarbonizado. “Formación profesional para la empleabilidad”. • 217 La norma IEC61850 está dividida en diez partes: IEC 61850-1: Introduction and overview . IEC 61850-2: Glossary . IEC 61850-3: General requirements . IEC 61850-4: System and project management - Ed.2 . IEC 61850-5: Communication requirements for functions and device models. IEC 61850-6: Configuration language for communication in electrical substations related to IEDs - Ed.2. IEC 61850-7: Basic communication structure for substation and feeder equipment. IEC 61850-7-1: Principles and models - Ed.2 . IEC 61850-7-2: Abstract communication service interface (ACSI) - Ed.2. IEC 61850-7-3: Common Data Classes - Ed.2. IEC 61850-7-4: Compatible logical node classes and data classes - Ed.2. IEC 61850-7-10: Communication networks and systems in power utility automation - Requirements for web-based and structured access to the IEC 61850 information models. IEC 61850-8: Specific communication service mapping (SCSM). IEC 61850-8-1: Mappings to MMS (ISO/IEC9506-1 and ISO/IEC 9506-2) - Ed.2. IEC 61850-9: Specific communication service mapping (SCSM). IEC 61850-9-1: Sampled values over serial unidirectional multidrop point to point link. IEC 61850-9-2: Sampled values over ISO/IEC 802-3 - Ed.2. IEC 61850-9-3: Precision Time Protocol Profile for Power Utility Automation (IEEE C37.238-2011). IEC 61850-10: Conformance testing.

RkJQdWJsaXNoZXIy OTM0Nw==